Buker XWINNMR Command List
(Updated 10/10/2008)
Setup Experiment:
edasp...................edit RF channels: make sure using the right amp and preamp
ns........................number of transition to be acquired
a .........................go to current acquisition display
ased..................... acquisition parameters short list
eda....................... all acquisition parameters long list
dpa .......................display acquisition parameters
edhead ..................edit probe file
expt .......................experiment time
gs........................... interactive acq parameters
halt .........................Stop and save data
stop.......................... stop and no save
kill ..............................kill current experiment
multihalt........................ stop multizg experiment
multizg ..........................array experiments
rg ................................set receiver gain
setti ..............................edit text
sw ..............................spectral width
swh...............................Spectrum width in herts
tr ...................................During the acquisition transfer current data and ready for processing
za ..................................Zero and go, display fid
edlock.......................... edit lock parameters
zg ..................................Zero and Go
wpar............................... Write a parameter file
rpar ................................Read a parameter file
edasp ...............................Set up channels and power routing
expt....................total experiment time
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
Solid State NMR Operation Commands:
edlock.............................Change lock parameters, need root passwd
cfmas ..............................configure MAS parameters
masr.............................. set spin rate
edasp.............................. edit RF channels
edte............................... edit temperature parameters
popt................................ array a parameters
paropt.............................. parameter optimization (array experiments, set rg dg1 zoon phase etc before the paropt.the array will be displayed in 999)
rsh/wsh ............................Read and write shims
vish ...............................view shim file
power.......................... calculate watts to voltage
Date Process
ft ................................FT current data
si................................. Zero fill to si data point
efp................................ em ft and phase
apk................................. auto phase
abs ..................................baseline correction set absg=0
apk0................................. zero zero order phase
Dataset Operation
edc
d............................. down one expo
dd............................. down two expo
iexpno........................... up one expno
iexp.......................... up one new exp.
u/uu........................... up one expo
dual........................... enter dual display
edc23........................... set 2 and 3 rd data set